Dear Contractor,
The following is information that you will need to know for the connection process to the Thatcher Hill Water System.
- We only allow three excavators to connect to our main line. Names and numbers are listed below. You, (the contractor), are responsible to get on their
schedule. We will not do this for you. Their fee is separate from the $20,000.00 connection fee given to Thatcher Hill Water Company. - The connection to the main line will need to be stubbed to the lot
and the line from the house needs to be attached to the yoke for a meter to be set. - Connection fee must be paid before the meter will be set.
- Once you are ready for a meter, contact Scott Waldron 406-640-1033.
He will inform our Water Operator that you are ready for water. - You must allow 2 weeks for the installation of a meter.
- Do not block access to the meter hole or it will not be installed.
- We have to have both ends stubbed to the yoke for a pressure test at install, so make sure water inside the home is turned off.
Download, print, and sign the contractor agreement above. By signing this document, you confirm that understand the rules and regulations that we require for hook up in the Marble Hills Sub Division.