Contractor Information

Dear Contractor,

The following is information that you will need to know for the connection process to the Thatcher Hill Water System.

  • We only allow three excavators to connect to our main line.  Names and numbers are listed below.  You, (the contractor), are responsible to get on their
    schedule.  We will not do this for you. Their fee is separate from the $20,000.00 connection fee given to Thatcher Hill Water Company.  
  • The connection to the main line will need to be stubbed to the lot
    and the line from the house needs to be attached to the yoke for a meter to be set. 
  • Connection fee must be paid before the meter will be set.  
  • Once you are ready for a meter, contact Scott Waldron 406-640-1033.
    He will inform our Water Operator that you are ready for water.
  • You must allow 2 weeks for the installation of a meter.
  • Do not block access to the meter hole or it will not be installed.  
  • We have to have both ends stubbed to the yoke for a pressure test at install, so make sure water inside the home is turned off. 
Please download our contractor agreement here

Download, print, and sign the contractor agreement above. By signing this document, you confirm that understand the rules and regulations that we require for hook up in the Marble Hills Sub Division.                                 

Excavators :
Grover Excavation   435-230-0085
Misrasi Excavation  435-257-5324
Valley View Excavation 435-890-2683

Thatcher Hill Water Co.
P.O. Box 24
Tremonton, UT 84337

Have questions? Please feel free to reach out to us. Contact Us

Thatcher Hill Water Co.

Copyright © 2025 · Thatcher Hill Water Company · Log in